E+D Mod. Prop. Worksheet#

KUMAVISION factory365 offers the functionality E+D Change Proposal to compare the manufacturing data (FA routings and FA components) of the E+D order with the master data (routings and finished parts lists). If the data of the E+D order differs from the master data, the E+D change proposal suggests a change in the E+D order.

Note

If the change flexibility of the E+D order line is set to "none", this line is ignored in the change comparison.

The mask can be called up both via the user search and directly via the E+D order using the functions "Execute change proposal" and "Execute new comparison".

Field Description
E+D Position Position number of the line in the structure of the assemblies.
Type Definition of the line, the options are:

• Article,
• Phantom Bill of Materials,
• Workstation Group,
• Workplace
No. The number is dependent on the type.
Working aisle no. Number of the operation, if the type is "work center group" or "work center".
Event message Indicates the corresponding event message.
Accept event message The "Accept event message" identifier is preset to "Yes" in E+D Planning if the "Planning - Accept event message" field in the "Design & development settings" is set to "Automatic". If the field is set to "Manual", the identifier is pre-assigned with "No".
Detail. Change notification Shows the description of the change.
Description Description depending on the type.
(e.g.: article description, operation description)
Age value Displays the value from the production order.
New value Displays the value from the finished parts list or routing.
Area Displays the area where the change is to be made.
FA status Displays the status of the production order in which the change is to be made.
FA no. Displays the production order number in which a change is made.
FA line no. Displays the line no. of the production order in which a change is made.
Change flexibility Identifier, which allows a line to be excluded from the proposed change.

The available options are "Unlimited" and "None".

This parameter is set manually by the production management per FA line and FA component.
Comparison date Displays the date of the comparison.
Variant code (to be manufactured) Specifies the variant to be manufactured.
Version code (to be fert.) Specifies the version to be manufactured.
Proposal version code (to be fert.) Version that would have to be made if the proposed change is executed.
Change notification Marks the line as a change and the type of change -.
• New,
• Change,
• Remove,
• Empty
Accept change message Here it can be decided line by line which change is accepted by the user.

The program will suggest you changes.
Item no. (component) If the change concerns a component, its article number is displayed here.
Variant code (component) If the change concerns a component and this has a variant, the valid variant of the article number is displayed here.
Work plan ref. no. Line number of the production order to which the routing is assigned.
Work plan no. Displays the job number of the FA line.
Routing version code Displays the version of the routing assigned in the production order.
Proposal work plan ref. no. Displays the line number of the production order in which the routing is to be assigned.
Proposal Work plan no. Displays the task list number that is entered after the change adjustment.
Proposal routing version code Displays the new valid version of the task list number entered after change matching.
Proposal work plan status Displays the status that the routing assumes in the FA when the change proposal is executed.
Finished parts list no. Indicates the production BOM found.
Finished parts list version no. Indicates the found valid version of the production BOM.
FA- Component line no. Specifies the component line number in the found production BOM.
Proposal Finished parts list no. Displays the found and valid production BOM.
Proposal Fert. version code Displays the valid BOM version that is transferred to the FA during a change comparison.
Proposal Finished BOM status Displays the status found with the current production BOM.

The change proposal lines only have an influence on the E+D order as soon as the Execute change message function is carried out for the selected proposal lines (Accept change message = YES).

Functions in the ribbon#

Get Error Log#

Opens the E+D error log.

Prod. Order Routing#

Opens the FA work plan of the FA line.

Calculate net change plan#

The "Perform change comparison" function is used to compare production data, taking into account the change flexibility parameter on the E+D order line.

Calculate regenerative plan#

The new comparison ignores the change flexibility parameter in the change comparison and therefore takes all E+D order lines into account.

Carry out action message#

The marked lines are accepted/executed with the "Execute event message" function.

Production Order#

Opens the production order (standard view).

Prod. Order Components#

Opens the FA components (standard view).

E+D-Order#

Opens the E+D order (similar to production order).

E+D Order Routing Plan#

Opens the E+D order routing (analogous to FA routing).

E+D Order Components#

Opens the E+D order components.

E+D Modification Proposal Order Routing#

Displays the routing lines of the E+D order line.

E+D Modification Proposal Components#

Displays the component lines of the E+D order line.