Manufacturing#
The following features expand standard Microsoft Dynamics 365 Business Central1 functionality to provide additional options to those working in your organization’s production department.
Reports and documents#
To assist you in your manufacturing tasks, medtec365 provides route sheets and barcodes matching the numbers that you assigned to production orders, components, and operations in the system. To set up the feature for first use:
- Choose the Search icon, enter Report Selections Production Order, and then choose the related link.
- In the Usage field, choose Project Card.
- On a line, in the Report ID field, select report 5007239 (Route Sheet).
Afterward, you can add route sheets to your production processes. When you run the report to create a sheet, you can also choose on the Options FastTab whether you want to have additional information printed on the document, as described in the following table.
Option | Description |
---|---|
Incl. Bar Code | Turn on this toggle to have a bar code printed on the sheet. |
Incl. Materials | Turn on this toggle to have the materials required for each production step printed on the document. |
No. of Copies | Specify the number of sheets you need. |
Ease-of-use improvements#
To increase traceability and transparency, you can now turn production order numbers into lot numbers so that you can continue to track items even when the status of a production order changes.
- Choose the Search icon, enter KUMAVISION medtec365 Setup, and then choose the related link.
- On the Manufacturing FastTab, turn on the Prod. Order No. as Lot No. toggle.
See the following table for an explanation of the other fields on the tab.
Field | Description |
---|---|
Default Scheduling Period | Here you can specify a date formula that will be used to refresh the ending dates on requisition and planning worksheets. The result of the calculation is added onto the value in the Starting Date field when you fill in a worksheet. Example You enter 12M. This means that the next time you fill in a requisition or planning worksheet, the Starting Date field will be filled in with the work date, whereas the Ending Date field will show the same day and month, only a year later (unless that day is not a workday). |
Default Run Time | Turn on this toggle if you want the system, and not staff members, to fill in run times. |
Default Setup Time | Turn on this toggle if you want the system, and not staff members, to fill in setup times on production and output journals. |
All Flushing Methods for Tracked Items | Turn on this toggle if you want production order components that require item tracking and a flushing method other than Manual to be posted automatically to production and consumption journals. |
Default location code and bin code from item#
If the "location" and "bin" fields are maintained on the "Procurement" fast tab on the item card, the storage location and storage bin are pre-assigned in the following processes according to the setup on the item:
-
If the item is entered in the production order as an origin number when the production order is created manually, then based on the storage location/storage bin from the item card, the storage location code/storage bin code fields in the production order header are filled.
-
If the item is entered in a parts list as a parts list component.
-
If the item is entered manually in the production order components in a production order.
-