Intercompany Work#
Overview#
The intercompany management functionality is designed for users who have set up multiple independently operating business entities, each aiming to cover a different region or territory or provide a distinct range of products and services to customers.
Called companies in the system, they typically manage their own data and finances. Sometimes, however, several of them might need to supply products or services to the same customer at the same time. For example, a project might require that staff members working for one company lend their expertise to another. This is where IC management can help coordinate and bill work done on a project.
Intercompany functions and roles#
When a customer places an order for an intercompany project, one organization typically takes on the role of main contractor. This business will be referred to in the following as the billing company.
The services and materials required for the project are then stored on WBS lines that you set up within that company. However, to provide a specific service, the business now hires another to act as a subcontractor, which will be called the service company for the purposes of this article.
The business relationship between both companies isn’t set in stone. For other projects, the roles might be reversed, and the organization that used to supply a service might become the business entity that bills the project. A billing company can hire multiple service companies for a project or complete work on its own.
All service companies are set up as vendors in the partner company that bills the project. The partner, in turn, is entered as the customer in each service company. The actual customer is stored with the project that you set up in the billing company.
To transfer a resource task to a service company, you can then choose WBS lines in the partner business and use a function to copy the entire project, including the selected lines, to the service company for processing the order.
Service companies always send invoices to a billing company and never directly to a client. The project ledger entries that are created from posting these outgoing invoices—marked as inbound in the billing company—are assigned to a WBS and later invoiced to the end customer according to a project-specific price agreement.
Billing and service companies might use different local currencies, which will affect how invoices are settled internally. For example, a billing company might be sending invoices in EUR, whereas the business providing services for the project being billed might have entered DKK as its local currency in Finance Setup.
Setup#
Register a billing company#
Before you can copy project data from one business to another, you need to turn on IC management. The settings described here only need to be made once.
Choose an IC partner#
Each billing company must have a service company assigned as an IC partner. To assign a partner:
- Choose the Search icon, enter Intercompany Partners, and then choose the related link.
- On the ribbon, choose New to set up a partner.
- Fill in the fields as described in the following table.
General#
Field | Description |
---|---|
Currency Code | Specify the currency used by the service company. |
Transfer Type | Specify the type of data transfer. Note Intercompany project management in KUMAVISION project365 currently only supports data transfers between billing and service companies stored in the same database. This field must therefore be set to Database. |
Company Name | Enter the name of the service company. Note Intercompany project management in KUMAVISION project365 currently only supports data transfers between billing and service companies stored in the same database. |
Purchase Transaction#
This FastTab shows the vendor assigned to the billing company’s IC partner.
To set up a vendor, open a vendor card and choose a company partner in the IC Partner Code field on the General FastTab. The Vendor No. field is then filled in automatically.
KUMAVISION project365#
Filling in the fields on this FastTab is optional but provides you with a set of alternate numbers and codes when you transfer data to a service provider. WBS and budget lines that you create in a billing company include primary keys, that is, numbers and codes, for the following project information:
- Resources and resource groups
- Work packages
- Phase codes
- Task codes
- Step codes
- Work types
Because data records in service companies don’t need to have primary keys identical to those in a billing company, you can use the options on this FastTab to specify new numbers and codes for them as described in the following table.
Field | Description |
---|---|
Internal Code (Internal No. for resources) | The code (or number) is copied as is from the billing company to the service company. |
Shared Code (Shared No. for resources) | The code (or number) is copied from the Shared Code field in the billing company’s data record to the service company. |
Activity IC Partner Ref. (Resource IC Partner Ref. for resources) |
The code (or number) is copied from the IC Partner Reference field in the billing company’s data record to the service company. A reference can be added to a data record wherever you can set up the numbers and codes listed earlier. |
Example
In a billing company, a work package named Project Management with code AP001, shared code PL, and new number RAB001 was entered on a WBS line that you want to copy to one or more service companies.
Internal Code
Billing company code AP001 is copied as is to all service companies.
Shared Code
Shared package code PL is copied to all service companies instead.
Activity IC Partner Ref.
Work package code RAB001 is copied to service company IC1020.
As you can copy projects from one billing company to multiple service companies, the first two options apply to all existing service providers.
The third features company-based code calculations for service companies, which makes it the most flexible but also the most time-consuming setup solution.
For resources or resource groups, there also exists the option of converting a certain resource in the billing company into a resource group in the service company as you copy data from one to the other.
This option is particularly useful if a certain resource is entered on a budget line in a billing company, but the partner company only requires that the line be completed by a member of the related resource group, and the other way around.
To turn on the option, select Resource IC Partner Ref. in the Outbound Project Resource No. Type field on an intercompany card. You also need to assign the resource to the relevant service company. To do this:
- Open the relevant resource card.
- On the ribbon, choose Related > Resource > IC Partner References.
- Fill in the fields as necessary.
Field | Description |
---|---|
Type | Specifies the type of record. In our example, the field is set to Resource automatically. |
No. | Specifies the number of the record. In our example, the number of the resource is filled in automatically. |
Cross-Reference Type | Specifies the type of company reference. In our example, the type is set to Vendor. |
Cross-Reference No. | Specifies the number of the company reference. In our example, the vendor number is retrieved from the service company. |
New Type | Select the type that you want to store in the service company, for example, Resource Group. |
New No. | Specify a new number based on the preceding field. |
Description | Enter a description of the intercompany reference. |
Another field on the FastTab is the Outbound Project No. field, which shows the number that you want to use for projects copied to the partner company. The options in this field are described in the following table.
Field | Description |
---|---|
New No. | Assigns to the project the next number from the default series that you set up for new projects in the service company. |
Shared Project No. | Retains the number from the billing company so that the number will be the same in both companies. |
No. Series | Assigns a new number from a specific series that must exist in both companies. The number series is selected in the Outbound Project No. Series field. |
Register a service company#
Service companies must also be configured before first use.
Choose an IC partner#
Like a billing company, a service company must be assigned to an IC partner. To assign a partner:
- Choose the Search icon, enter Intercompany Partners, and then choose the related link.
- On the ribbon, choose New to set up a partner.
- Fill in the fields as necessary.
General#
Field | Description |
---|---|
Currency Code | Specify the currency used by the billing company that you want to assign to the subcontractor. If the billing partner uses another local currency than the service company, the code specified for the currency must be the same in both companies. In our earlier example, where the billing company’s local currency is EUR and the service company’s is DKK, EUR needs to be specified as a currency in the service company. |
Transfer Type | Specify the type of data transfer. Note Intercompany project management in KUMAVISION project365 currently only supports data transfers between billing and service companies stored in the same database. This field must therefore be set to Database. |
Company Name | Enter the name of the billing company. Note Intercompany project management in KUMAVISION project365 currently only supports data transfers between billing and service companies stored in the same database. |
Sales Transaction#
This FastTab shows the customer assigned to the service company’s IC partner.
To set up a customer, open a customer card and fill in the IC Partner Code field on the General FastTab. The Customer No. field is then filled in automatically.
In the Outbound Sales Resource No. Type field, you specify if you want the number of a billing resource to change when a sales invoice is sent by the subcontractor to the billing company, where it is converted into a purchase invoice. Billing resources are used by service companies to charge for work they have done on a project. The options available in the field are described in the following table.
Option | Description |
---|---|
Internal No. | Copies the number of the resource from the service company’s outgoing invoice to the billing company’s inbound invoice. |
Shared No. | Replaces the number of the resource on the billing company’s inbound invoice with the value specified in the service company on the card of the resource in the Shared No. field. |
Resource IC Partner Ref. | Replaces the number of the billing resource on the billing company’s inbound invoice with an IC partner reference, which is stored as additional information on resource cards in service companies. |
Note
This field is not to be confused with the Outbound Project Resource No. Type field.
The Outbound Project Resource No. Type field is used to copy projects, including selected WBS and budget lines, from a billing to a service company and is maintained by the billing company see Register a Billing Company.
The opposite is true for the Outbound Sales Resource No. Type field, through which the system converts resource numbers on sales invoices sent to billing companies. This field is updated only in service companies and extends standard functionality to include IC transfers of resource-type invoice lines, which are needed to calculate project usage based on billing resources.
You can also use the Outbound Sales Resource No. Type field for other purposes, for example, when you don’t work on a specific project but want to copy a sales invoice with resource lines between companies.
The Shared Type or New Type field must then be set to Resource, as only resources, not resource groups, can be copied to sales and purchase invoices.
Copy projects from billing to service companies#
As described earlier, you must set up an IC partner as a customer and another as a vendor if you want to copy a project from a billing to a service company.
Before you can exchange information between them, you also must have specified how basic project information is converted during transfers, including conversion rules for resources and resource groups, work packages, phases, tasks, steps, and work types.
Create a project in a billing company#
To use intercompany management, a billing company must be specified as the main contractor. You also need to create a project with WBS lines and budget lines and select a customer for it.
Additional fields on the project card, on the Intercompany FastTab, then show the status of transfers between the billing company and its subcontractors.
The No. of IC Partners is the only relevant field on this FastTab in a billing company. The field shows the number of service companies to which the project has been copied. The other fields are required by service companies and are described later.
Before you can copy a project to a service company, you need to open the relevant WBS and assign a partner through the IC Partner Code field to each line that you want to transfer. You can assign a different IC partner per line if necessary. All lines not assigned to a partner contain work packages that will be provided by the billing company. Afterward, you need to run the Copy Project to IC Partner function from the project card.
The budget lines you set up for the project are then copied alongside their WBS lines to the service company. To prevent the system from transferring a line, you must select the No IC Transfer checkbox there.
Example
Besides the services ordered, another budget line has been set up. This line must not be copied, as it is used for intercompany reconciliations. To prevent the line from being copied, you select the No IC Transfer field there.
The Copy Project to IC Partner action requires the selection of an intercompany partner. Available are all partners specified as such on the WBS lines of the project, which will make it easier for you to choose a partner if many companies have been stored in the system. You then need to rerun the function for each partner that you want to send the project to.
If you’ve turned on the ICP Ships to Customer Address toggle on the project card (might already be filled in from a project template), the address specified for the project is entered as the service company’s ship-to address. With the toggle turned off, the project will be delivered to the business billing the services, that is, to the customer address entered there.
Specify resource prices#
Besides WBS and budget lines, you can use prices that were agreed on by a service and a billing company to create invoices for internal billing. Each price you enter on the Project IC Partner Resource Prices page applies only to a specific project.
When you copy a project, the price is then copied to the service company’s Project Resource Prices page. The fields on both pages are identical.
Based on what option you selected in the Type field, you can enter price information for specific resources, resource groups, or all resources.
A price that is stored in the Price (LCY) field is always shown in a billing company’s local currency. This is because the work performed by subcontractors will be billed in the currency specified for the billing company.
Copy a project to a service company#
To copy a project from a billing to a service company:
- Open a project card.
- Choose Copy Project to IC Partner.
- On the Options tab, choose the IC partner to which you want to copy the project.
- Choose OK to start the transfer. The number of records copied is shown when the process is complete.
Note
A project can only be copied if it set to Open and the WBS lines you want to transfer have the work status In Progress or Open.
Running the function increments the value in the No. of IC Partners field in the billing company (see the Intercompany FastTab on the project card). This field specifies to how many partners a project has been copied so far. You can go to the field to open a list that shows all IC partners assigned to the project and the number they gave the project.
As the same project can be copied to an IC partner multiple times to update information, the number of times a project was copied to a single business is shown as well. To see a complete log of all transfers, select the No. of Transfers field.
A project is copied to only one intercompany partner at a time. However, you can run the Copy Project to IC Partner function as often as you need. You can also use it repeatedly, for example, to copy additional WBS lines to the same IC partner or to add new price agreements from the Project IC Partner Resource Prices page.
As mentioned, running the function more than once to copy data to the same project and partner increases the value in the No. of Transfers field in the Project IC Partner table by one.
Each time, the function checks if the billing company contains all the data necessary for transferring resources and resource groups, work packages, phases, tasks, steps, and work types to the relevant service company.
For example, if you select Shared No. as the outbound project resource number type on a resource card, the system checks during transfer if this field has been filled in for each resource and group that you want to copy and then copies its value to the subcontractor.
The same applies to conversions based on the Activity IC Partner Reference option. If you use this conversion rule, all data that you want to copy must have a reference entry to an activity in the billing company, and the New No. field stored there cannot be blank. However, the function doesn’t check if new values calculated according to the rule are valid in the service company.
Review data in a service company#
Prior to an explanation of how to review project data, an example will demonstrate how much of a project stored in a service company is copied from a billing company.
Scope of data transfer#
A number is assigned to a project in a service company depending on what option you chose in the Outbound Project No. field on the billing company’s project card.
In our example, the New No. option has been chosen on the project card. When the project is copied from the billing to the service company, a new number is then assigned to the project automatically. This number is the same as the number that is stored in the billing company’s IC partner list.
In the service company, you can now see on the Intercompany FastTab on the card of the same project where the project originates. The two projects are therefore linked—the prerequisite for copying invoices and assigning ledger entries between companies.
Linking a service to a billing company also fills in other Intercompany FastTab fields relevant to the service company. They are described in the following table.
Field | Description |
---|---|
Source IC Partner Code | Specifies the code of the IC partner if a project is copied from a billing company. The field is empty if the project is a standard project with no intercompany reference. |
Source IC Partner Project No. | Shows the number of a project stored with a billing company if the project has been copied from there. This field is empty if the project is a standard project. |
IC Review Status | A project copied from a billing company must be reviewed in the current service company before it can be posted. This field shows the status of the review. (blank) The project is a standard project that hasn’t been copied from a billing company. Open The project needs to be reviewed. A project receives this status automatically after its initial transfer from a billing company. When you repeat the transfer, the field is filled in again if new data is copied to the project. Completed The project has been fully reviewed. |
IC Res. Price Review Open | Shows if the transfer included project resource prices that still need to be reviewed. |
IC WBS Line Review Open | Shows if the transfer included WBS lines that still need to be reviewed. |
IC Budget Line Review Open | Shows if the transfer included budget lines that still need to be reviewed. |
The customer stored with the service company is the billing company, as the service company isn’t the end customer but the subcontractor.
If a billing and a service company use different local currencies, we recommend that you already store the invoice currency for the organization that bills services with the company that supplies them. Invoices sent between a service and a billing company always appear in the currency set up for the billing company.
Copying project data to a service company also copies information from the project's WBS header and lines, including from its budget lines. In our example, the work package ordered is transferred as well, with the rest of the packages to be completed by the billing company on its own.
You can copy a project from a billing to a service company more than once. If you do so, the system will skip WBS or budget lines that have been copied to the subcontractor in the past. For this reason, the IC review status of all budget lines is identical to that of their WBS lines.
In the service company, you can then edit the copied WBS and budget lines or create new lines manually. You can also create budget lines for a WBS line transferred from the billing company. This means that projects set up in service companies can have both WBS and budget lines with and without a reference to a billing company.
Project transfers additionally include the headings and extended texts that were entered on WBS and budget lines to help subcontractors provide required services. However, this again only occurs the first time you copy lines. Neither headings nor texts will be updated during repeats.
Similarly, comments entered for a project, WBS lines, or budget lines aren’t copied at all, as they’re considered internal information intended only for employees of the billing company. Dimensions (on a project header, on WBS lines, and on budget lines) typically aren’t copied either, as they’re recalculated in service companies depending on how you set them up there.
Project IC resource prices, on the other hand, are transferred to the Project IC Prices page. Furthermore, some base data used for project management is converted according to the rules specified in the billing company. This includes data regarding resources and resource groups, work packages, phases, tasks, steps, and work types.
Still, after a project has been copied to a service company, multiple fields on the project header, the WBS lines, and the budget lines remain blank. Examples are the address fields on the header and the price fields on the lines.
When you transfer a project, the system strictly applies the specified conversion rules to make changes to data in the service company. However, it doesn’t check if a copied field value can be used in that company.
For example, although project usage might be assigned to a resource group, the system doesn’t check whether the group exists in the service company. Because there might be other missing and partly non-validated information, the Locked toggle on the card of a copied project is set to Post automatically after each transfer. You then need to review the project before you can post to it.
Review a project in a service company#
Sometimes, the conversion rules that you specified for intercompany transfers might not be enough. For example, the phase, task, and step codes set up for a project might not exist in the service company to which you copied the job.
To check project data in a service company:
- Open a project card in the company.
- Choose Actions > IC Review on the ribbon.
- On the Options tab, select for phase, task, and step codes if you want them created automatically or whether the review process should be canceled with an error message when one of the codes doesn’t exist.
- If a project transfer has created inconsistencies in other data, for example, in resource group records, the process will be canceled regardless.
- Choose OK to start the review.
The system then runs a check on all project-related data that was copied to the service company. If the process is canceled because of an error, you can correct the error manually and rerun the function.
Following the review, some of the Intercompany FastTab fields on the project card are updated as described in the following table.
Field | Description |
---|---|
IC Review Status | The status of the review is set to Completed. |
IC Res. Price Review Open | The status that indicates if there are still resource prices to review is set to No. |
IC WBS Line Review Open | The status indicating if there are still WBS lines to review is set to No. |
The Locked toggle on the General FastTab is then turned off as well, which will allow you to post to the project again.
The status of the project, however, is still set to Quote. You can set the status to Open in the usual way, via the Status field, and fill in the Person Responsible field thereafter.
To post consumption to a work package entered on the WBS, you need to set the work status of the package to Released. You can also add more packages, if necessary.
Example
You set up a package for coordinating work with the business that placed the order you’re currently completing. Because the package isn’t invoiced to your intercompany partner, you set the Billing Type field to No Billing. This way, the WBS line on which you filled in the package in the service company will not be linked to a line in the billing company.
Note
You cannot delete budget or WBS lines that are copied to the service company in this way.
Post consumption in a service company#
Before you can post time and material usage for a project in a service company, you need to ensure that the data pertaining to the project is validated (see Review a Project in a Service Company).
The project is then treated like any other: Employees can record their hours on it, and the project manager can approve these hours and post them to the project.
Sales invoices can also be created in the usual way, by using the suggestion feature. The differences to standard processes start when you’re about to post an invoice to the billing company. Not only will it be submitted through an IC transfer, but it will be recreated as a purchase invoice there as well.
Meanwhile, the project ledger entries created from item and resource consumption are aggregated into intercompany commitments. For more information, see Billing Company Commitments.
Post time#
To post hours on a WBS line set up in a service company, you must change the work status on the line to In Progress. You can then enter and post hours through your project time journal.
Example
You post two hours spent on coordinating work with an IC partner in the time journal. The remaining hours will go toward the services requested by the partner.
Post project ledger entries#
To convert posted hours into project usage, open a project journal and choose Process > Get Time Entries. This posts the journal lines and creates project ledger entries.
Billing company commitments#
Typically, invoices exchanged between a billing and a service company are based on project usage entries posted in the service company. These, in turn, often originate from hours posted by the subcontractor’s employees.
As the intervals between posting project-related work hours, converting them into usage, and billing them might be relatively long, it could prove helpful to be able to estimate the expenses incurred by a service company before an invoice is even created.
These estimates show up in billing companies as intercompany commitments. They represent either hours recorded for a project in a service company but not yet posted as usage or project usage posted but not yet invoiced. Commitments consist only of entries that can be invoiced and that originate from WBS lines included in an IC transfer to the service company.
To (periodically) collect and compile billing-relevant time and usage entries, you can run the Calculates Lines function from the Project IC Commitment page.
Show unbilled entries#
Although the Project IC Commitment page looks like a journal, it’s not used to post but to collect project data from a subcontractor and show that data in a billing company.
As a billing company can be linked to multiple service companies and data for each might be available at different times, every company providing services gets its own intercompany commitment page, with the page bearing the name of the business it was created for.
To copy data from a subcontractor to this page:
- Open a billing company.
- Choose the Search icon, enter Project IC Commitment, and then choose the related link.
- Select an IC page in the Name field.
- Choose Calculate Lines on the ribbon.
The page then shows the intercompany commitment values copied from the service company. If there are no unposted time entries, the commitment will consist entirely of project ledger entries (see the Entry Type field).
The transfer includes only entries from ordered, billable work packages; non-billable packages aren’t copied from the service company.
The fields that can be found on the page are described in the following table.
Field | Description |
---|---|
Project No. | Shows the number of the project as specified in the billing company. |
Project Description Sell to Customer No. Sell-to Customer Name |
Shows these fields as they appear in the project set up in the billing company. |
WBS Line No. | Shows the number of a WBS line set up in the billing company. |
Type No. Phase Code Task Code Step Code |
Shows these fields as they appear on the WBS line set up in the billing company. |
Budget Line No. | Shows the number of a budget line set up in the billing company. |
ICP Project No. | Shows the number of the project as specified in the service company. |
ICP WBS Line No. | Shows the number of a WBS line set up in the service company. |
ICP No. ICP Phase Code ICP Task Code ICP Step Code |
Shows these fields as they appear on the WBS line set up in the service company. |
ICP Budget Line No. | Shows the number of a budget line set up in the service company. |
Entry Type Entry No. |
The Entry Type field has two options: Time and Project Ledger (Unbilled Usage). A line on the page thus refers to either a time or a project ledger entry copied from the service company. The Entry No. field shows the number of the entry as specified in the service company. |
Posting Date Document No Resource No. Description Start Time End Time |
Shows these values as specified for the time or project ledger entry set up in the service company. |
Quantity Unit of Measure Code Qty. per Unit of Measure Quantity (Base) |
Shows quantity and measurement values as specified for the time or project ledger entry in the service company. |
Unit Price (LCY) Line Discount % Total Price (LCY) |
The first field shows the expected unit price that will be used for invoices sent from the service company to the billing company. Prices and amounts on IC invoices are always given in the billing company’s local currency. If the line on the page refers to a usage entry in a service company, as determined by the Entry Type field, the values in these fields are copied from that entry (with amounts given in the invoice currency). If the line refers to a time entry stored in the service company, the values in these fields are transferred from a budget line—provided one is available. Otherwise, they’re set to 0. |
Performance Date Performance Resource No. Performance Resource Name Performance Unit of Meas. Code |
These fields also originate from either a time or a usage entry stored in the service company. They’re used for informational purposes only, to provide a more detailed description of the services rendered. When the service company submits an invoice to the billing company, the values in these fields are copied there alongside other project data. The project ledger entries stored on the invoice will later be transferred to the bill sent to the end customer (see the Sell-to Customer No. field). |
Running the Calculate Lines function as described earlier deletes all lines, even those copied previously, before retransferring data from the service company.
This function is the only tool available to you for updating lines on an IC commitment page. Posting new time or project ledger entries in the service company will not have the same effect.
In short, you need to run the function in the billing company on a regular basis and do so at the latest before you intend to analyze the IC commitment with the help of fields calculated automatically on the company’s WBS lines.
Show on a WBS#
Every WBS and budget line contains two fields for determining a billing company’s IC commitment. One shows the commitment by quantity, the other by value. Both fields are sourced from the Project IC Commitment page.
As this page shows the WBS and budget lines of all service companies assigned to a specific project, we recommend that you include the commitment fields in analyses only after you have updated the relevant IC commitment pages. Both fields are described in the following table.
Field | Description |
---|---|
Qty. IC Commitment (Base) | Shows the result of totaling the Quantity (Base) fields of all data records in the Project IC Commitment Line table. |
Total Price IC Commitment (LCY) | Shows the result of totaling the Total Price (LCY)) fields of all data records in the Project IC Commitment Line table. |
Send invoices to a billing company#
A group of intercompany-specific outbound and inbound transactions is used to bill consumption posted in a service company to the company invoicing the work to the end customer.
Create an outbound invoice in a service company#
You create invoices in a service company in the usual way, through suggestions. To create an invoice that you want to send to a billing company:
- Open a service company.
- Choose the Search icon, enter Invoice Suggestion, and then choose the related link.
- On the ribbon, choose the Create Suggestion Lines function. This fills in the page with all consumption entries posted for the services provided.
- Select the Direct Invoice checkbox for entries that you want to bill.
- On the ribbon, choose the Create Invoice action, and then choose OK to create an invoice from the suggestion.
Example of an outbound invoice#
Following on from our earlier example, you run the Create Invoice function from the Invoice Suggestion page to create an invoice with amounts given in EUR, the billing company’s local currency. In the service company, EUR is a foreign currency, as the local currency set up there is DKK.
Running the function then creates a resource-type invoice line showing the number of the billing resource that you specified for the Project Management work package.
The line also includes invoice entries. These are later used to close the project ledger entries stored on the line and provide proof of performance.
Post an outbound invoice#
Posting an invoice in a service company creates a posted invoice, invoice lines, and invoice entries, as well as G/L, resource, and project ledger entries of type Sale. As the customer entered on the invoice is set up as an IC partner, this process additionally triggers an outbound transaction.
Standard intercompany transactions aggregate data for outbound documents such as invoices and credit memos on the Intercompany Outbox Transactions page. The page is now also used to submit the posted (outbox) invoice from the service to the billing company.
To see the document that you want to transfer, open the page, select the invoice, and then choose Outbox Transactions > Details on the ribbon.
In our example mentioned earlier, the outbox transaction is used to transfer a posted sales invoice, with amounts given in foreign currency EUR, from the service company to its IC partner. Standard functionality only transfers invoice lines through outbox transactions if the lines you want to send are of type Item or G/L Account. Because of the use of billing resources in the project365 industry solution, the functionality has been extended to give you the added option of sending resource-type invoice lines to an IC partner.
Furthermore, fields were added to the standard outbox transaction lines to show you project information stored in billing companies, for example, in the Source IC Partner Project No. and Source IC Partner Work Package Code fields.
Outbox transaction lines also have invoice entries. These are copied from the lines of a posted invoice when you set up an IC transaction.
In the Comments and Comments (Project Ledger Entry) fields, you can view the internal and billing-related comments for the project ledger entries you’re about to invoice. When a transaction is sent to a billing company, only notes relevant to billing are copied to the company, whereas in-house comments are ignored.
The transaction in our example can now be transferred from the service to the billing company for further processing.
Send an outbound transaction#
To transfer data on the Intercompany Outbox Transactions page:
- Select the IC transactions that you want to send.
- On the ribbon, choose Actions > Send to IC Partner. This sets the Line Action field of all selected transactions to Send to IC Partner.
- Choose Functions > Carry Out Line Actions, and then choose OK.
Based on our earlier example, this would copy the outbox transaction created in the service company—along with the posted sales invoice—to the billing company.
Afterward, the document would be moved automatically from the Intercompany Outbox Transactions to the Handled Intercompany Outbox Transactions page.
Inbound transactions and purchase invoices#
Outbox transactions sent from a service company are received by a billing company as inbox transactions. The transaction information then needs to be checked before it can be used to create a purchase invoice. This invoice is later posted in the billing company to increase project usage relative to the amount of work performed by the service company.
Receive a transaction in a billing company#
As the service and the billing company must always be stored in the same database, sending an outbox transaction will create an inbox transaction in the billing company automatically.
Inbound transaction data#
To see what kind of data was received through an inbox transaction:
- Choose the Search icon, enter Intercompany Inbox Transactions, and then choose the related link.
- Select a transaction. On the ribbon, choose Process > Details.
On the header, the inbox transaction shows information about the intercompany partner and the vendor assigned to it. This information was converted from the partner’s outbox transaction and is presented here from the vantage point of the billing company to which the transaction was sent.
The lines transferred together with the transaction relate to the project and WBS lines to which you need to post in the billing company.
When you initially sent this project to the service company, the number of the project, as well as the reference values on transferred WBS lines, were copied to the WBS in the service company for informational purposes.
These key fields are now used to identify the project and WBS lines you want to post to. Both the project and the specified WBS lines must exist in the billing company.
Existing invoice entries and, potentially, billing-related comments are also part of the transfer. Project ledger entry comments—viewed as internal information—aren’t.
Additionally, the resource number on an outbox transaction line is copied as is to the corresponding inbox line. As the number might later be converted when you create a purchase invoice, it doesn’t yet need to exist in the billing company.
Accept an inbound transaction and create a purchase invoice#
When you’ve finished checking the transmitted data, you can use the information to create a purchase invoice from the Intercompany Inbox Transactions page in a two-step process:
- Choose the IC transactions that you want to accept. On the ribbon, choose Actions > Send to IC Partner. This sets the Line Action field of all selected transactions to Accept.
- Choose Process > Carry Out Line Actions, and then choose OK.
The system then creates a new purchase invoice from the selected transactions and moves them from the Intercompany IC Inbox Transactions to the Handled Intercompany Inbox Transactions page.
Post purchase invoices in a billing company#
View an invoice in a billing company#
The vendor shown on the invoice is the vendor set up for the billing company’s IC partner, that is, the service company.
Going by our example mentioned earlier, the next field on the header, Currency Code, would be blank. This is because the invoice sent by the service company would be in the billing company’s local currency, which is EUR.
The No. field on the invoice lines, on the other hand, would be filled in with the code of a billing resource. This code might change before being transferred to an invoice, based on what conversion option you choose in the Outbound Purch. Res. No. Type field on a service company’s IC partner card.
For example, if you choose the Internal No. option in the field, the resource number is converted according to the simplest of rules—or, more specifically, it remains as is.
Note
To transfer a resource to a purchase line in a billing company, you need to set the resource to External.
Meanwhile, the invoice entries initially transferred to inbox transaction lines are now copied to the Purch. Line Project Dstrn. page, where you can take a closer look at every invoice line created from the current IC transaction. To look at a specific line:
- Choose the Search icon, enter Purchase Invoices, and then choose the related link.
- Select a purchase invoice.
- Go to the Lines FastTab and select a purchase line.
- On the ribbon, choose Line > Purchase Line Project Dstrn.
Each line on the page might contain comments like those stored with invoice entries on inbox transaction lines. This means that the data shown on a purchase invoice in a billing company closely matches what you see on the original sales invoice sent by its service company partner.
Post an invoice#
Prior to an explanation of how you post a purchase invoice in a billing company, some general notes about the Purchase Line Project Dstrn. page mentioned earlier:
The purchase line distribution feature isn’t limited to the use case described in this article, that is, to transmit invoices between service and billing companies. Instead, as the name implies, it can be used to store all kinds of information on a resource-type purchase line if the line is assigned to a project and its work breakdown structure.
In short, the feature also allows you to store information about project-related subtasks on every purchase line on which a resource has been entered. The distribution lines created from this kind of purchase line receive from it not only the resource number and relation to a project and WBS line but also price specifications and line dimensions.
In turn, the quantity entered on all distribution lines combined must match the value specified on the purchase line.
But the feature can do more than provide you with an option to describe subtasks in purchasing. One notable benefit is its utility in posting partial consumption when you post a purchase invoice, as a consumption entry will be posted for each distribution line instead of one entry for the entire purchase line.
Posting a purchase invoice then copies the distribution lines (and the comment lines available for it) alongside other data to the invoice and assigns them to invoice lines.
Posting the invoice also creates G/L, vendor, resource, and consumption entries. The consumption entries are posted in a billing company to the WBS line from which they were originally copied to the business supplying services.
Fields such as Performance Date and Billing Resource Name, both of which are part of every consumption entry, can additionally be used to describe the work performed by the relevant service company in more detail.
Invoice end customers in billing companies#
The end customer is invoiced in the same way as you would a customer for a non-IC project. The original source of the project ledger entries that you want to bill isn’t relevant in this case.